Policy

Firing & Scheduling.

We run a steady firing cadence and build loads around portal submissions.

Effective Feb 1, 2026

Key points

What to expect

  • \n Schedule through the portal\n

    Submit work through the portal and include clay body, glaze, and firing type.

    \n
  • \n
  • \n Cadence and turnaround\n

    We fire at least once per week. Average turnaround is about 1.5 days from the time a load fires.

    \n
  • \n
  • \n Kiln specs\n

    Our current L&L kiln has multi-zone temperature control and is rated to cone 10 in oxidation.

    \n
  • \n
  • \n Kiln capacity\n

    A typical load fits about 8 half shelves (≈8 carry-on suitcases laid flat).

    \n
  • \n
  • \n Queue priority\n

    Outside firing clients are our primary kiln queue. Loads are built by fit and firing type.

    \n
  • \n
  • \n Pickup windows\n

    Pickup is during normal business hours. We will notify you when pieces are ready.

    \n